previous arrow
next arrow
previous arrownext arrow
Slider

Once both the stringing and bending are complete, the pipe sections are aligned, welded together, placed on temporary supports, and x-rayed. A coating crew then powder-coats the pipe along the welded joints, inspects the coating, and lowers the pipe into the trench.

Equipment
Cat 72H Vanguard
Automatic Welding Shacks
Cat 583