The ditch is excavated in harmony with the lowering-in crew using a series of sidebooms, which allow the operators to simultaneously lift and carefully lower the welded pipe sections into the trench. After the pipeline is successfully laid in place, crews begin backfilling the trench.

Equipment
Cat PL87
Cat 352
48” Roller Cradles